
Universal Assembly System
The Universal Assembly System (UAS) features modular flexible assembly, intelligent multi-sensor collaboration, and full-process data closed-loop management. It enables adaptive assembly of components with different sizes and materials through quick changeover of tooling fixtures, and integrates technologies like visual positioning and force control feedback to optimize process parameters in real time. Suitable for complex and precise assembly in fields such as electronic manufacturing (e.g., precision connectors, semiconductor packaging), automotive and new energy (e.g., powertrains, battery modules), medical, and aerospace (e.g., implantable devices, aero-engine components), it achieves a positional repeatability of ±0.01mm, force control accuracy of ±0.01N, and visual positioning accuracy of ±5μm, meeting the sub-millimeter to micrometer-level assembly precision requirements for scenarios such as MEMS component picking, chip-level packaging, and high-precision bolt tightening.
Components Qty | 10 parts |
Cycle Time | 6.0 sec/pc |
Pneumatic Parts | SMC |
OEE | 80% |
First Pass Yield | 98% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 2 operators |
Certificate | CE |
After the equipment has been assembled and debugged, we will select suitable packaging materials to properly protect the equipment. This will effectively safeguard it against impacts, moisture, and ensure it is firmly secured, guaranteeing that the equipment arrives at its destination intact.




● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Respond to defects within 4 hours.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.




1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project’s on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer’s technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.