{"id":2988,"date":"2025-07-04T14:23:01","date_gmt":"2025-07-04T06:23:01","guid":{"rendered":"https:\/\/www.rzautoassembly.com\/?p=2988"},"modified":"2025-08-01T13:50:18","modified_gmt":"2025-08-01T05:50:18","slug":"selection-guide-for-non-standard-automation-equipment-5-dimensions-and-30-evaluation-indicators-for-clients","status":"publish","type":"post","link":"https:\/\/www.rzautoassembly.com\/hu\/selection-guide-for-non-standard-automation-equipment-5-dimensions-and-30-evaluation-indicators-for-clients\/","title":{"rendered":"Selection Guide for Non-Standard Automation Equipment: 5 Dimensions and 30 Evaluation Indicators for Clients"},"content":{"rendered":"<h1 style=\"text-align: center;\"><span style=\"font-family: 'times new roman', times, serif;\">Selection Guide for Non-Standard Automation Equipment: 5 Dimensions and 30 Evaluation Indicators for Clients<\/span><\/h1>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-2990 aligncenter\" src=\"https:\/\/www.rzautoassembly.com\/wp-content\/smush-webp\/2025\/07\/\u975e\u6807\u81ea\u52a8\u5316\u8bbe\u5907\u5e7f\u544a\u521b\u610f-101-1-300x288.png.webp\" alt=\"\" width=\"300\" height=\"288\" srcset=\"https:\/\/www.rzautoassembly.com\/wp-content\/smush-webp\/2025\/07\/\u975e\u6807\u81ea\u52a8\u5316\u8bbe\u5907\u5e7f\u544a\u521b\u610f-101-1-300x288.png.webp 300w, https:\/\/www.rzautoassembly.com\/wp-content\/smush-webp\/2025\/07\/\u975e\u6807\u81ea\u52a8\u5316\u8bbe\u5907\u5e7f\u544a\u521b\u610f-101-1-1024x982.png.webp 1024w, https:\/\/www.rzautoassembly.com\/wp-content\/smush-webp\/2025\/07\/\u975e\u6807\u81ea\u52a8\u5316\u8bbe\u5907\u5e7f\u544a\u521b\u610f-101-1-768x736.png.webp 768w, https:\/\/www.rzautoassembly.com\/wp-content\/smush-webp\/2025\/07\/\u975e\u6807\u81ea\u52a8\u5316\u8bbe\u5907\u5e7f\u544a\u521b\u610f-101-1-13x12.png.webp 13w, https:\/\/www.rzautoassembly.com\/wp-content\/smush-webp\/2025\/07\/\u975e\u6807\u81ea\u52a8\u5316\u8bbe\u5907\u5e7f\u544a\u521b\u610f-101-1.png.webp 1328w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Bevezet\u00e9s: A rossz berendez\u00e9s kiv\u00e1laszt\u00e1s\u00e1nak \u00e1ra \u2014 Tanuls\u00e1gok a \u201e800 ezer doll\u00e1ros befektet\u00e9st\u0151l\u201d a \u201ek\u00e9t \u00e9v t\u00e9tlens\u00e9gig\u201d<\/p>\n<p>A smart home enterprise in Zhejiang customized an \u201cintelligent lock detection line\u201d. Due to blindly choosing a low-cost supplier (ignoring core technical maturity), the equipment had issues such as\u00a0\u201cpoor multi-model compatibility\u201d (only adapting to 30% of products),\u00a0\u201cunstable detection accuracy\u201d (15% missed detection rate), and\u00a0\u201cafter-sales response exceeding 72 hours\u201d\u00a0after delivery. It was eventually forced out of use, with the 800K investment wasted. Selecting non-standard equipment is a multi-dimensional game of \u201ctechnology + business + risk\u201d. This article constructs 5 evaluation dimensions + 30 core indicators to help clients build a scientific selection framework.<\/p>\n<p>I. K\u00f6vetelm\u00e9nyilleszt\u00e9s: Prec\u00edzi\u00f3s igaz\u00edt\u00e1s az \u201eelm\u00e9leti\u201d \u00e9s a \u201eforgat\u00f3k\u00f6nyv szerinti\u201d k\u00f6z\u00f6tt<br \/>\n\u25b6 Alapvet\u0151 logika: A felszerel\u00e9s \u201eprobl\u00e9mamegold\u00f3\u201d eszk\u00f6z, nem pedig \u201etechnol\u00f3gi\u00e1t bemutat\u00f3\u201d j\u00e1t\u00e9k.<br \/>\nEvaluation Dimension Core Indicators Evaluation Method Case Reference<br \/>\nDepth of Requirement Understanding 1. Whether requirement documents are quantified (e.g., \u201ccycle \u226412s\/piece\u201d, \u201cyield rate \u226598%\u201d)<br \/>\n2. Accuracy of production line pain point positioning (e.g., identifying the bottleneck of \u201cmanual clamping accounting for 35% of man-hours\u201d) Compare the supplier\u2019s proposal with the on-site VSM value stream map, and check the indicator coverage rate (requiring \u226590% of core requirements to be addressed) A auto parts factory required \u201coil seal assembly yield rate \u226599%\u201d, but a supplier\u2019s proposal only mentioned \u201cimproving efficiency\u201d and was directly eliminated<br \/>\nProcess Adaptability 3. Whether it is compatible with multi-specification products (e.g., new energy equipment needs to support 166\/182\/210mm silicon wafers)<br \/>\n4. Environmental adaptability (cleanroom\/ex \u9632\u7206 \/low-temperature environment certification) Require the supplier to provide process parameter tables of same-scenario cases (e.g., actual measurement data of alignment accuracy for lithium battery pole piece laminators) Medical device projects must select suppliers certified by FDA cleanrooms to avoid later compliance rectification (cost +500K)<br \/>\nFlexible Expansion Capability 5. Number of reserved IO interfaces (\u226520% redundancy, such as 20 inputs\/15 outputs)<br \/>\n6. Degree of software modularity (whether it supports \u201cone-click product model switching\u201d) On-site demonstration of \u201cmodel change testing\u201d: record switching time (target \u226415 minutes) and parameter adjustment complexity (whether programming is required) 3C electronics projects select equipment supporting \u201c3-second quick-change fixtures + HMI parameter import\u201d, improving model change efficiency by 80%<br \/>\nII. M\u0171szaki \u00e9retts\u00e9g: \u00c1tt\u00f6rni a \u201em\u0171szaki koncepci\u00f3\u201d k\u00f6d\u00e9t, \u00e9s a \u201emegval\u00f3s\u00edt\u00e1si k\u00e9pess\u00e9gre\u201d \u00f6sszpontos\u00edtani<br \/>\n\u25b6 Alapvet\u0151 logika: A technol\u00f3gia nem arr\u00f3l sz\u00f3l, hogy \u201e\u00fajabb\u201d, hanem \u201estabilabb\u201d legyen<br \/>\nEvaluation Dimension Core Indicators Evaluation Method Pitfall Avoidance Points<br \/>\nCore Technology Verification 7. Whether core modules such as vision\/force control\/AI have mass production cases (requiring \u226510 same-type devices running for over 6 months)<br \/>\n8. Completeness of simulation reports (including mechanical\/control simulation data, such as deformation \u22640.05mm) Obtain the supplier\u2019s FAT test report and verify the compliance rate of key indicators (requiring \u226595%) Beware of \u201claboratory-level technologies\u201d: a supplier used self-developed AI algorithms without actual production line verification, resulting in a missed detection rate exceeding 10%<br \/>\nPrecision Stability 9. Repeat positioning accuracy (e.g., robotic arm \u00b10.02mm)<br \/>\n10. Long-term operation precision drift (1000 hours \u2264\u00b10.01mm) Require third-party inspection reports (such as China Metrology Institute certification) or on-site measurement of 300 times to take the average New energy projects must test \u201cpole piece lamination alignment accuracy\u201d. A device \u6807\u79f0 \u00b10.02mm, but actual measurement was \u00b10.04mm, causing a sharp drop in yield rate<br \/>\nControl Algorithm Maturity 11. Fault handling mechanism (e.g., over-travel emergency stop response time \u226450ms)<br \/>\n12. Self-diagnosis function (fault code coverage rate \u226590%) Simulate extreme working conditions (such as 20% material tolerance) and observe whether the equipment triggers protection and generates effective alarm codes A non-standard bending machine had no \u201csynchronous belt slack\u201d warning, leading to batch product scrapping and losses exceeding 200K<br \/>\nIII. Besz\u00e1ll\u00edt\u00f3i er\u0151ss\u00e9g: A \u201eberendez\u00e9s kiv\u00e1laszt\u00e1sa\u201d egyenl\u0151 a \u201epartner kiv\u00e1laszt\u00e1s\u00e1val\u201d, a \u201esz\u00e1ll\u00edt\u00e1s ut\u00e1ni vissza\u00e9l\u00e9sek\u201d elker\u00fcl\u00e9s\u00e9vel.<br \/>\n\u25b6 Alapvet\u0151 logika: A besz\u00e1ll\u00edt\u00f3 \u201em\u00faltja\u201d hat\u00e1rozza meg a \u201ej\u00f6v\u0151det\u201d<br \/>\nEvaluation Dimension Core Indicators Evaluation Method Key Data<br \/>\nIndustry Expertise 13. Years of industry experience (recommended \u22655 years, \u22658 years for high-barrier fields like new energy\/medical)<br \/>\n14. Number of same-type cases (recommended \u226530, with over 30% from leading clients) Field visit to the factory and review of the client list (e.g., Apple\/Huawei cases in the 3C field, CATL cooperation in new energy) A supplier established for 2 years undertook a medical device project. Due to unfamiliarity with GMP specifications, the equipment was rectified 3 times, causing a 6-month delay<br \/>\nSupply Chain Management 15. Number of key component suppliers (recommended \u22652 alternative suppliers for key components, such as simultaneously certified Panasonic\/Siemens servo motors)<br \/>\n16. Material readiness rate (requiring \u226590%, which can be inferred from past project delivery cycles) Require the supply chain risk assessment report, focusing on the procurement cycle of customized parts (recommended \u226445 days) A project was delayed by 30 days due to a customized sensor procurement cycle exceeding 60 days, and the supplier had no alternative plan, resulting in heavy losses<br \/>\nAfter-Sales Response Speed 17. 400 hotline connection rate (non-working hours \u226410-minute response)<br \/>\n18. Spare parts delivery cycle (vulnerable parts \u22643 days, customized parts \u226415 days) Call the supplier\u2019s after-sales phone for testing or contact its old clients for real feedback (e.g., average on-site arrival time of 48 hours for an enterprise) 3C electronics enterprises must select suppliers with \u201c4-hour on-site + 7\u00d724-hour remote support\u201d to avoid production line shutdown losses<br \/>\nIV. K\u00f6lts\u00e9ghat\u00e9konys\u00e1gi mutat\u00f3: Sz\u00e1m\u00edtsa ki a \u201eteljes \u00e9letciklus-sz\u00e1mla\u201d \u00e9rt\u00e9k\u00e9t, utas\u00edtsa el az \u201ealacsony \u00e1r\u00fa csapd\u00e1kat\u201d<br \/>\n\u25b6 Alapvet\u0151 logika: A \u201efelszerel\u00e9sv\u00e1s\u00e1rl\u00e1s\u201d a kezdet, a \u201efelszerel\u00e9shaszn\u00e1lat\u201d pedig a k\u00f6ltekez\u00e9s f\u0151 csatatere<br \/>\nEvaluation Dimension Core Indicators Evaluation Method Formula Tools<br \/>\nBudget Matching 19. Quotation transparency (itemized listing of material\/R&amp;D\/debugging costs, error \u226410%)<br \/>\n20. Reasonableness of payment nodes (recommended to pay \u226460% after prototype acceptance, avoid prepayment exceeding 30%) Require a cost breakdown sheet and compare with the average price of same-specification equipment (e.g., reasonable range for non-standard testing machines is 500-800K, beware of \u201closs-making quotations\u201d below 400K) Use the \u201cequipment investment payback period formula\u201d: Payback period = total equipment price \/ (annual labor savings + annual production capacity gain), recommended \u22641.5 years<br \/>\nFull Life Cycle Cost 21. Energy consumption indicators (e.g., power consumption per hour \u226415kW\u30fbh)<br \/>\n22. Maintenance costs (annual spare parts expenses \u22645% of equipment total price) Obtain the operation report of similar equipment and calculate OEE overall efficiency (recommended \u226580%, each 10% lower causes annual losses exceeding 100K) A hardware factory\u2019s equipment energy consumption exceeded industry peers by 30%, resulting in an annual additional electricity cost of 80K, and over 400K more spent in 5 years, far exceeding initial low-price advantages<br \/>\nROI Measurability 23. Production capacity improvement commitment (e.g., from 50 pieces\/hour to 120 pieces\/hour, requiring attached calculation basis)<br \/>\n24. Yield rate improvement guarantee (e.g., from 85% to 98%, requiring provision of same-scenario data) Require signing an\u00a0\u300aIndicator Compliance Agreement\u300b\u00a0to clarify compensation clauses for non-compliance (e.g., deduct 1% of the contract amount for each 1% lower yield rate) A auto project deducted 15% of the balance as per the agreement due to the equipment failing to meet production capacity commitments, avoiding risks of \u201cdata overstatement\u201d<br \/>\nV. Kock\u00e1zatkezel\u00e9s: \u201eFekete hatty\u00fak\u201d el\u0151rejelz\u00e9se, \u201ebiztons\u00e1gi szelepek\u201d ki\u00e9p\u00edt\u00e9se<br \/>\n\u25b6 Alapvet\u0151 logika: A nem szabv\u00e1nyos projektek \u201ebizonytalans\u00e1gait\u201d a \u201erendszereknek\u201d kell r\u00f6gz\u00edteni\u00fck<br \/>\nEvaluation Dimension Core Indicators Evaluation Method Risk Control Tools<br \/>\nRequirement Change Management 25. Whether a \u300aChange Agreement\u300b is signed (clearly defining change response time \u226448 hours and cost-sharing ratio)<br \/>\n26. Historical project change rate (recommended \u226410%, which can be calculated from the supplier\u2019s past project documents) Review the supplier\u2019s change management process and require the provision of \u300aRequirement Change Record Sheets\u300b from past projects Adopt a \u201crequirement freeze period\u201d mechanism: freeze requirements within 45 days after plan confirmation, and changes require senior management approval from the client to reduce later rework risks<br \/>\nProject Management Capability 27. Whether a PMP-certified project manager is assigned<br \/>\n28. Milestone node completion rate (recommended \u226590%, view past project Gantt charts) Require the project plan and verify whether key nodes (scheme\/prototype\/delivery) reserve 20% buffer time A project had \u5931\u63a7 in the supply chain\/debugging links due to the absence of a professional project manager, causing a 3-month delay. Risks could have been \u9884\u5224 in advance through node buffering<br \/>\nCompliance Guarantee 29. Completeness of industry certifications (e.g., ISO 13485 for medical devices, HACCP for food)<br \/>\n30. Data security commitment (local storage of equipment data or cloud transmission through ISO 27001 certification) Inspect original compliance certificates and verify their authenticity through official channels (e.g., query cleanroom certification numbers on the FDA website) Equipment exported to the EU must select CE-certified suppliers. An enterprise suffered 500K losses due to ignoring EMC electromagnetic compatibility certification, leading to customs detention<br \/>\nVI. \u00dcgyf\u00e9lm\u0171velet: 3 l\u00e9p\u00e9s a tudom\u00e1nyos kiv\u00e1laszt\u00e1si folyamat ki\u00e9p\u00edt\u00e9s\u00e9hez<br \/>\n1. K\u00e9sz\u00edtsen egy \u201eKiv\u00e1laszt\u00e1si \u00c9rt\u00e9kel\u00e9si \u0170rlapot\u201d a Mennyis\u00e9gi Pontoz\u00e1shoz<br \/>\n\u00c9rt\u00e9kelje mind a 30 mutat\u00f3t 5 dimenzi\u00f3ban 1-t\u0151l 5-ig terjed\u0151 sk\u00e1l\u00e1n (pl. a \u201e8 \u00e9v vagy ann\u00e1l id\u0151sebb ipar\u00e1gi tapasztalat\u201d 5 pontot, a 3 \u00e9vn\u00e9l r\u00f6videbb id\u0151szakok 1 pontot kapnak), a 120 vagy ann\u00e1l nagyobb \u00f6sszpontsz\u00e1m pedig tov\u00e1bbjut a k\u00f6vetkez\u0151 fordul\u00f3ba.<br \/>\n\u201eEgy szavazatos v\u00e9t\u00f3\u201d be\u00e1ll\u00edt\u00e1sa a kulcsfontoss\u00e1g\u00fa mutat\u00f3kra vonatkoz\u00f3an (pl. t\u00f6meggy\u00e1rt\u00e1s hi\u00e1nya az alapvet\u0151 technol\u00f3gi\u00e1k eset\u00e9ben, hi\u00e1nyz\u00f3 megfelel\u0151s\u00e9gi tan\u00fas\u00edtv\u00e1nyok, k\u00f6zvetlen kiz\u00e1r\u00e1s).<br \/>\n2. A \u201eH\u00e1rom kihagyhatatlan l\u00e1tnival\u00f3\u201d helysz\u00edni megtekint\u00e9se<br \/>\nSee the factory: Observe production processes (e.g., whether the prototype debugging area is standardized and whether quality inspection equipment is complete);<br \/>\n: K\u00f6telez\u0151 l\u00e1togat\u00e1sokat kell v\u00e9gezni az azonos t\u00edpus\u00fa, haszn\u00e1latban l\u00e9v\u0151 berendez\u00e9sekn\u00e9l, \u00e9s r\u00f6gz\u00edteni kell a t\u00e9nyleges m\u0171k\u00f6d\u00e9si adatokat (pl. l\u00edtium akkumul\u00e1toros eszk\u00f6z lamin\u00e1l\u00e1si sebess\u00e9ge \u00e9s hozama);<br \/>\nKommunik\u00e1ljon a m\u0171szaki vezet\u0151kkel az ipar\u00e1gi f\u00e1jdalompontok alapos ismeret\u00e9nek meg\u00edt\u00e9l\u00e9se \u00e9rdek\u00e9ben (pl. \u80fd\u5426 magyar\u00e1zza el a \u201eg\u00f6rb\u00fclt fel\u00fclet\u0171 k\u00f6t\u00e9si bubor\u00e9kok\u201d kiv\u00e1lt\u00f3 ok\u00e1t a 3C elektronik\u00e1ban).<br \/>\n3. \u00cdrjon al\u00e1 egy \u201ekock\u00e1zatmegoszt\u00e1si\u201d szerz\u0151d\u00e9st<br \/>\nClarify\u00a0\u201cindicator breach clauses\u201d(e.g., deduct 10% of the balance for unmet cycle requirements, deduct 0.1% of the contract amount daily for delayed delivery);<br \/>\nAgree on\u00a0\u201cintellectual property ownership\u201d(e.g., algorithm models customized by the client belong to the client to avoid being kidnapped by suppliers during later upgrades).<br \/>\nK\u00f6vetkeztet\u00e9s: A kiv\u00e1laszt\u00e1s nem \u201efeleletv\u00e1laszt\u00f3s k\u00e9rd\u00e9s\u201d, hanem \u201esz\u00e1m\u00edt\u00e1si probl\u00e9ma\u201d<\/p>\n<p>A nem szabv\u00e1nyos berendez\u00e9sek kiv\u00e1laszt\u00e1s\u00e1nak l\u00e9nyege az optim\u00e1lis megold\u00e1s megtal\u00e1l\u00e1sa a \u201em\u0171szaki k\u00e9pess\u00e9g, a besz\u00e1ll\u00edt\u00f3i megb\u00edzhat\u00f3s\u00e1g, a k\u00f6lts\u00e9ghat\u00e9konys\u00e1g \u00e9s a kock\u00e1zatkezel\u00e9s\u201d k\u00f6z\u00f6tt. Amikor egy \u00faj energetikai v\u00e1llalat a fenti mutat\u00f3kat felhaszn\u00e1lva kik\u00fcsz\u00f6b\u00f6lt egy \u201ealacsony \u00e1r\u00fa, de l\u00edtium akkumul\u00e1torh\u00e1z n\u00e9lk\u00fcli\u201d besz\u00e1ll\u00edt\u00f3t, \u00e9s egy \u201e20% dr\u00e1g\u00e1bb, de CATL tapasztalattal rendelkez\u0151\u201d partnert v\u00e1lasztott, a berendez\u00e9sek sz\u00e1ll\u00edt\u00e1si ciklusa 30%-vel ler\u00f6vid\u00fclt, a hozamr\u00e1ta 2%-vel meghaladta a v\u00e1rakoz\u00e1sokat, \u00e9s a v\u00e9gs\u0151 megt\u00e9r\u00fcl\u00e9si r\u00e1ta el\u00e9rte a 2,5-szeres\u00e9t \u2013 ez meger\u0151s\u00edti, hogy a tudom\u00e1nyos kiv\u00e1laszt\u00e1s nem a p\u00e9nzmegtakar\u00edt\u00e1sr\u00f3l, hanem a befektet\u00e9sr\u0151l sz\u00f3l; nem a kock\u00e1zatok elker\u00fcl\u00e9s\u00e9r\u0151l, hanem azok kezel\u00e9s\u00e9r\u0151l.<\/p>\n<p>(K\u00f6vetkez\u0151 el\u0151zetes: \u201eAz ember-g\u00e9p egy\u00fcttm\u0171k\u00f6d\u00e9s \u00faj paradigm\u00e1ja a nem szabv\u00e1nyos automatiz\u00e1l\u00e1si berendez\u00e9sekben: A hat\u00e9konys\u00e1g forradalma a \u201eg\u00e9pcser\u00e9t\u0151l\u201d az \u201eember-g\u00e9p egy\u00fcttm\u0171k\u00f6d\u00e9sig\u201d\u201d, elemzi, hogy az er\u0151szab\u00e1lyoz\u00e1si technol\u00f3gia, a biztons\u00e1gi \u00e9rz\u00e9kel\u0151k \u00e9s a mesters\u00e9ges intelligencia algoritmusai hogyan \u00e9rik el a hat\u00e9kony egy\u00fcttm\u0171k\u00f6d\u00e9st az emberek \u00e9s a berendez\u00e9sek k\u00f6z\u00f6tt az \u201eautomatiz\u00e1l\u00e1si szigetek\u201d probl\u00e9m\u00e1j\u00e1nak megold\u00e1sa \u00e9rdek\u00e9ben.)<\/p>\n<p><a href=\"https:\/\/www.rzautoassembly.com\/hu\/products\/\">\u201eEpson robot\u201d<\/a>\u00a0<a href=\"https:\/\/www.rzautoassembly.com\/hu\/products\/\">\u201eEpson robot Szingap\u00far\u201d<\/a>\u00a0<a href=\"https:\/\/www.rzautoassembly.com\/hu\/products\/\">\u201e6 tengelyes robot\u201d<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Selection Guide for Non-Standard Automation Equipment: 5 Dimensions and 30 Evaluation Indicators for Clients Introduction: The Price of Choosing the Wrong Equipment \u2014\u2014 Lessons from \u201c800K Investment\u201d to \u201cTwo Years of Idleness\u201d A smart home enterprise in Zhejiang customized an \u201cintelligent lock detection line\u201d. Due to blindly choosing a low-cost supplier (ignoring core technical maturity), [\u2026]<\/p>","protected":false},"author":1,"featured_media":2989,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[126,1,124],"tags":[],"class_list":["post-2988","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","category-news","category-technology"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/posts\/2988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/comments?post=2988"}],"version-history":[{"count":0,"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/posts\/2988\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/media\/2989"}],"wp:attachment":[{"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/media?parent=2988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/categories?post=2988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rzautoassembly.com\/hu\/wp-json\/wp\/v2\/tags?post=2988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}